OMNI recently completed Alltech’s relocation of their Bepex Granulator System. This multi-story production line was disassembled in Canada and reassembled in the United States to increase production in Kentucky!
After visiting the Alltech site in Canada to begin the coordination efforts, the Millwright, Structural Steel, Process Piping and Electrical Systems were dissembled, shipped and reinstalled in the Alltech Springfield Kentucky plant.
With a very tight schedule of 30 days the system was retrofitted and totally assembled within the 30 day schedule.
This allowed Alltech to resume production on time with Great Success.
Big thanks to Dewey Blevins, OMNI Project Manager, and Butch Jacobs (OMNI Site Superintendent) for a great job well done!